Case Study

Derriford Hospital

Client:

Red Rock Electrical

Project Duration:

24 weeks

Scope of Project Works

To design, install and commission new 11kV infrastructure to support a new NHS Building.

HVPS supplied, installed and commissioned a1600kVA, Wilson E4 transformer and RMU.

The installation of a new 11kV ring served in 185mm Cu, BS7835 HV cable and integration and migration into the existing HV network.  

The design and installation of a new earthing system.

The supply and installation of the single cored LV cables from the new transformer to the incoming LV switchboard and to the embedded generator also.